Over the rainbow's first energy storage project was connected to the grid in Shenzhen, Guangdong

  • 2023-12-26 08:14
  • admin
  • Views
On January 6th, over the rainbow's first energy storage project was implemented in Shenzhen Buji Tianhong Store.
 
battery energy storage system

 
Buji Tianhong Power Storage Project consists of two sets of energy storage tanks, each of which is a 20-foot container. Each set of energy storage tanks is modular in design, intelligent in management, and has high safety characteristics, long service life, and a flexible system.
 
In 2022, over the rainbow reduced the electricity consumption of stores by 22.17 million kWh (excluding the epidemic situation, space, and other influencing factors) by improving the digitalization of energy management, reforming stores, and introducing new energy technologies such as "green electricity".
 
The landing of this energy storage project not only optimizes the energy consumption structure of stores, fully applies the peak-valley electricity price policy to optimize the cost curve, but also helps the local power grid to cut peaks and fill valleys, which is an important milestone in over the rainbow's active implementation of "double carbon" and provides an important equipment foundation for building a new power system.
 
This year, over the rainbow will further promote the innovation and energy-saving transformation of new energy projects and stores, promote the green and low-carbon transformation of energy, and take concrete steps on the road to the goal of "double carbon".
 

Next:Shanxi Hutou's 90MW photovoltaic energy storage project is connected to the grid for power generation

Previous:The 300MW/600MWh maximum electrochemical energy storage projects have been put into production one after another